[edit] Use of plum concrete
Civil design or engineering consultants use plum concrete to optimise the project costs in industrial projects.
Plum concrete, is where medium and large-sized stones are used as the aggregate. Plum concrete may also referred to as cyclopean or rubble concrete. The stone aggregates (plum) can be 150mm or 200 mm, or 300 mm or larger. The selection of plum size is based on the application, availability and engineering requirements.
This type of concrete maybe recommended for structures like gravity dams, barriers, bridges, or as mass concrete for machine foundations, retaining walls etc. Here the size of the plum would most likely be around 150 mm.
The uses of plum concrete are:
- For mass concreting where a high plain cement concrete (PCC) thickness is required due to strata.
- Under footing applications where the ground slope maybe between 1:10 to 1:50.
- In the construction of gravity dams, retaining walls, steep road slopes, bridge and culvert barriers.
- It is also used for road embankments, surface beds for water channels and machine foundations.
- For back filling deep or uneven sites
[edit] Properties of the plum concrete
The plum should be from trap rock (also know as Trapp or Trap), basalt or any other locally available stone. The stone should have at least 100 Kg/Sq mm minimum crushing strength. The stone should be hard, strong, durable, angular shaped, and with no seams, cracks or other structural defects.
The plum should be clean, and free from dirt, soil, organic or harmful materials. The process of plum batching should be carried out only after careful inspection of the materials.
The main difference between plum concrete and plain cement concrete (PCC) is that the filler materials used are large boulders, this helps bring costs down by up to 30% making it more economical.
[edit] Mix ratios of plum concrete
The specific application will help in decide the volume or ratio of plum required in the concrete. The plum to concrete ratio will be dictated by the engineering specification, however, when the plum is 150 mm, the plum volume is likely to be between 30% to 50% of finished concrete. When the plums are above 160mm, the volume of plum should be capped at 20% of the volume of finished concrete.
[edit] Preparation for plum concrete
The plum is added directly into the mixer or by spreading the plums over the wet mix followed by a further layer of concrete. When using the former method, the size of the plum should not be more than 1/3rd of the cross-section of the concrete mixer.
The specification of ingredients, mixing, placing, and testing should be as per IS456. Usually, M10 or M15 concrete is used.
The shuttering should be strong enough to avoid being damaged while stones are placed and concrete poured. The preparation of the working area and materials are as follows:
- Clean the working surface
- Remove any soft soil, dirt and other loose items, as these may affect the soil bearing capacity.
- Keep the surface moist by sprinkling water prior to pouring, this moisture is to ensure proper bonding.
- If needed Anti-termite treatment, can be spray applied.
It is recommended that a seven-day curing process is adopted to ensure full strength.
In summary, plum concrete can be utilised by civil design and engineering consultants for the strength and economic optimisation of projects, the specifics of this are dependent on suitable advice according to specific site conditions and particular project requirements.
[edit] Related articles on Designing Buildings
- Admixture, additive or agent.
- Admixtures in concrete.
- Architectural concrete.
- Cast-in-place concrete.
- Cellular concrete.
- Portland cement.
- Recycled concrete aggregate RCA.
- Reinforced concrete.
- Scabbling.
- Screed.
- Self-compacting concrete.
- Stratification of concrete.
- Testing concrete.
- The properties of concrete.
- The use of concrete structures to protect construction sites.
- Types of concrete.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.